• Google+
  • FaceBook
  • YouTube
  • en
  • pl

FAST Group will build a new Data Center for Social Insurance Institution

FAST Group won a tender “design and build” for over 500 square meter Data Center for Social Insurance Institution (ZUS). Tender parameters was price, experience and building time.
Fast Group received maximum points, value of the tender is over 1 250 000,00 EUR.
Project consists of: full design, building works, raised floor, precise air conditioning (800kW), ventilation, electrical installations, BMS, fire protection systems with fire suppression, cabling, over 100 racks with closed aisles and also 5-year warranty with preventive maintenance and hot-line with strict SLA’s.
“FAST Group confirmed their strong position on Polish market as a local company with 27-year traditions” says CEO of FAST Group – Aleksander Redlich.
FAST Group is a Polish based company specialized in building turn key Data Centers (design, build and service).