• Construction of the office and Data Center complex for Polskie Sieci Elektroenergetyczne S.A. in Radom
The project was executed in consortium with PORR Polska, with a total value exceeding PLN 500,000,000.

Scope of FAST Group works:

  • Guaranteed power supply, including modern modular UPS systems with a total capacity of 6 MW (VRLA and lithium-ion batteries)
  • Electrical, ICT, low-voltage installations, AV systems, and active devices
  • Fire detection and suppression systems (SSP, DSO, gas extinguishing – constant flow), in cooperation with GURECO Sp. z o.o.
  • Full coordination and execution in BIM technology, including FAT and SAT testing of systems
  • 24/7/365 service and maintenance with strict SLA response times

Project parameters:

  • Over 20,000 m² of usable space
  • Office and operator buildings
  • Data Center compliant with EN 50600 Class 4 standard
  • Advanced fiber optic, ICT, and power infrastructure
  • Systems meeting the highest reliability standards

Completion: 2021–2024

Selected References of Fast-Group Sp. z o.o. in Data Center Design and Construction

• Construction of the Specialist Outpatient Clinic and Server Room in Building A2 of the Clinical and Didactic Center of the Medical University of Łódź, ul. Pomorska 251 – Stage II of CKD development
Scope
: BIM (3D) documentation, structural and construction works, sanitary installations, electrical installations, LAN, active devices, integrated medical system, ACS, IDS, CCTV, BMS, a complete 250 kW server room, UPS, air-conditioning with free cooling and heat recovery, fire suppression system, DCiM, racks with cold aisle containment. Executed to TIER III standard.
Project value: over PLN 50,000,000
Completion: 2018–2020

• Guaranteed Power Supply Works for NASK S.A. Data Center – peak power 2 MW
Scope
: design documentation, structural and construction works, dual-path complete (2N) Data Center power supply, MV – 2 × 3150 kVA, split-system generators 2 × 1700 kVA / 1360 kW, modular UPS 1300 kW with lithium-ion batteries, sanitary and low-voltage installations.
Execution standard: TIER III / Rated-3
Contract value: over PLN 15,000,000
Completion: 2019–2020

• Design & Build of ZUS Backup Data Center, ul. Szamocka – 700 kW peak power, area over 500 m²
Scope:
design documentation, construction works, electrical and sanitary installations, ACS, IDS, CCTV, BMS, smoke extraction, fire protection, IG-541 fire suppression system with VESDA detection, guaranteed power supply, 104 rack cabinets with cold aisle containment and PDU strips. Executed to TIER III standard.
Project value: approx. PLN 5,500,000
Completion: 2017

• Expansion of the Primary Center – Polish Geological Institute – Server Room of 400 m² and 300 kW capacity
Scope:
design documentation, structural and construction works, electrical and sanitary installations, ACS, IDS, CCTV, BMS, smoke extraction, fire protection, IG-541 fire suppression with VESDA detection, guaranteed power supply, 104 rack cabinets with cold aisle containment and PDU strips. Executed to TIER III standard.
Project value: over PLN 2,500,000
Completion: 2016–2017

• Construction of a New Facility for the Ministry of Internal Affairs Data Center (CPD MSW), ul. Smyczkowa 10, Warsaw
Scope
: structural and construction works, sanitary and ventilation systems, MV and LV electrical installations, ACS, IDS, CCTV, BMS, smoke extraction, fire protection, multi-zone I-Flow fire suppression with VESDA detection, Category 7A LAN installation, chilled water air-conditioning with turbocore chillers 1 MW, UPS 850 kVA, generator, complete 200 kW server room with all systems. Project value: over PLN 30,000,000
Completion: 2014–2015

• Turnkey Server Room for Colocation – 500 kW peak power
Scope:
design documentation, structural and construction works (adaptation of warehouse hall), electrical and sanitary installations, ACS, IDS, CCTV, BMS, smoke extraction, fire protection, gas suppression, UPS, generator, BMS.
Project value: over PLN 4,000,000
Completion: 2014 (less than 3 months)

• Modernization (without downtime) of Power Supply and Air-Conditioning Systems for PKO BP COO and Turnkey Server Room for Inteligo
Scope:
structural and construction works, sanitary and ventilation installations including precision air-conditioning, electrical installations including busbars 3200A, UPS 1600 kW, generator modifications, gas suppression system, ACS, IDS, CCTV, BMS, smoke extraction, fire protection. Project value: over PLN 10,000,000
Completion: 2012

• Turnkey Server Room for PWPW S.A., ul. Karczunkowska
Scope:
structural and construction works, sanitary and ventilation installations including precision air-conditioning, MV and LV electrical installations, modular UPS, generator, gas suppression system, ACS, IDS, CCTV, BMS, smoke extraction, fire protection. Project value: over PLN 10,000,000
Completion: 2012–2013

• Data Center for Polska Spółka Gazownictwa sp. z o.o., Branch in Tarnów, ul. Karpacka
Scope:
comprehensive design works including IT ROOM compliant with PN-EN 1047-2; construction of IT ROOM (>200 m²) to PN-EN 1047-2, air-conditioning system, power system including modular UPS 360 kVA, Hercules generator 630 kVA, fire detection and suppression system, LAN/WAN network. Project value: over PLN 3,000,000
Completion: 2010

• Construction of ZUS Building with Server Room, ul. Szamocka, Warsaw
Scope:
structural and construction works, electrical installations, delivery and installation of IT ROOM protective enclosures for COO ZUS (256 m² and 170 m²), guaranteed power supply system over 6 MVA (UPS >3 MVA, Hercules generators 4 × 1 MVA). Project value: over PLN 9,000,000
Completion: 2008–2009