Investment for the Institute of Bioorganic Chemistry of the Polish Academy of Sciences – Poznań Supercomputing and Networking Center

We are pleased to announce the completion of a comprehensive investment project for the Institute of Bioorganic Chemistry of the Polish Academy of Sciences – the Poznań Supercomputing and Networking Center (PCSS) ⚡🖥️

The scope of our work included a full modernization of the protected power supply system within critical infrastructure. The project was carried out in several stages while maintaining uninterrupted operation of the infrastructure throughout the entire process:

🔹 development of the electrical installation design for the new UPS power supply system and air conditioning units, including the necessary modifications to the existing infrastructure,
🔹 delivery, installation, and commissioning of a modern, modular UPS system with efficiency over 97.5%, scalable up to 750 kW in one frame, together with a battery system,
🔹 delivery and installation of new air conditioning units tailored to the specific operating requirements of technical rooms,
🔹 decommissioning of the previously used UPS systems and air conditioners, in accordance with applicable regulations,

The entire system is now covered by service support provided by our engineers. Projects of this type require precise planning, experience, and close cooperation between all parties involved 🤝

We are glad that we could support PCSS in its further development and in increasing the reliability of infrastructure that forms the foundation of advanced computing and IT services 😊

Equipping server room for the project: DEVELOPMENT AND RECONSTRUCTION OF THE ADMINISTRATIVE OFFICE BUILDING OF THE MSWiA in Warsaw.

As part of the comprehensive project “Extension of the building of the State Medical Institute of the Ministry of the Interior and Administration (MSWiA)” at Wołoska Street in Warsaw, carried out together with 3R ModularClimatic, we had the pleasure of delivering the data center (server room) infrastructure — a key element of the hospital’s IT backbone 🏥💻

The entire build was delivered using a modular, prefabricated construction approach. Once completed, the number of above-ground floors will increase from 2 to 5, the net floor area will grow from 200 m² to over 600 m², and the building volume will expand from 1,100 m³ to over 2,800 m³ 📈

🔧 Our scope of work included, among others:

  • design documentation 📑
  • guaranteed power supply and electrical installations ⚡️
  • gas fire suppression systems with detection 🧯
  • early smoke detection system 🚨
  • security systems: CCTV and access control 🎥🔐
  • structured cabling 🧵
  • leak detection system 💧
  • BMS systems 🧠

Importantly, all works were carried out while maintaining the Institute’s uninterrupted operations

Thank you for your trust and smooth cooperation! 🤝🙂